Shop blog and archive of the projects and other things that come through the door.
Sunday, January 23, 2011
To Cold
Its way to cold to be working in the shop today. I dont want to waste the propane to heat it up. So im working on some plans and specs in the house where its nice and warm.
Saturday, January 22, 2011
Stripped hull
The hull is stripped, now to move on to the deck. i did the final closure strips with walnut, im thinking it looks pretty cool if you ask me. next step is to flip it over, release the forms and then start on the deck. im still thinking about a pattern for the forward end, but i have to see the shape of the deck first.
Tuesday, January 18, 2011
Wisdom?
I do believe that a boat takes on some characteristics of its builder during construction…. mine is just a little twisted…..
Monday, January 17, 2011
Still working on it
Another eight hours spent in the workshop, planing, shaping, gluing, clamping and tapering. I now have the deepest respect for those people who build a lot of kayaks. As this is my first build, each piece, each joint is a new skill i don't yet have. work progresses in spurts, sometimes slow, sometimes quickly, but never quick enough. I have run out of ceder strips again and will have to pick up another board this week. I am going to fill the final closures on the bottom with walnut, should look cool. I'm not sure what the deck is going to look like, pattern wise. I still have a lot of walnut that I can make smaller strips work with ceder fillers but we will just have to see.
A kayak can truly start you on a journey, even before it gets wet.
A kayak can truly start you on a journey, even before it gets wet.
Wednesday, January 12, 2011
134 days till race day
Its tough to get time to warm the shop up to do more work on the kayak. When the temp is down in the stupid range, it takes a lot of propane to keep my fingers working. Anyway im still working on the keel strips, I have the first one almost ready to install, I just need to steam in a little twist for the bow end to get the point right. I figured out that if I cut out the straightest parts of the warped walnut strips and nail them together, I can run them through the plainer and straighten them out, then I can scarf them together to make the length i need. Its working but slow going...
Thursday, January 06, 2011
Keel Strips
I'm working on the Keel strips now, I'm thinking these will be pretty important to keep straight and fitted tightly.
oh yea 140 days till the SD kayak Challenge
oh yea 140 days till the SD kayak Challenge
Monday, January 03, 2011
Sunday's Update
Ok, so this is not going as fast as i thought it would. 143 days till the SD Kayak challenge and my boat still leaks, big time. slow and steady wins the race right? I have installed the strips up to the chine and am now ready to do the bottom....
i know, i know, im going to take my time and do a good job....
i know, i know, im going to take my time and do a good job....
Subscribe to:
Posts (Atom)