Wednesday, August 10, 2022

Strips n forms

 The forms are all set and the strips have been cut and edge milled.




I use a cove and bead bit from Lee Valley tools to mill the edges of the strips, it makes a nice tight fit between strips and holds the glue well. I used 10 10'x5.5"x1" cedar deck boards to rip 150 or so strips. we will see if we need all of them.

Tuesday, August 09, 2022

Matched Pair

 The next project in the shop is a matched pair of canoes, one a 17 footer and the other a 12.5 foot solo canoe.


The first step is to set up the forms and get them level, plumb and aligned correctly.

Tuesday, January 11, 2022

1923 Larson Duck Boat Restoration

 I believe we are finished with this clean up and polish project! I have way more hours into this than I should have put but the end result is worth the extra time.. It will never float again without a layer of fiberglass on the hull, but it will make a sweet wall hanger for the client.




About a hundred years of barn dust and cobwebs, dry rot. An entire quart of varnish went into the wood on the first coat topside. I don't think I have ever seen wood that dry before.