Wednesday, August 10, 2022

Strips n forms

 The forms are all set and the strips have been cut and edge milled.




I use a cove and bead bit from Lee Valley tools to mill the edges of the strips, it makes a nice tight fit between strips and holds the glue well. I used 10 10'x5.5"x1" cedar deck boards to rip 150 or so strips. we will see if we need all of them.

Tuesday, August 09, 2022

Matched Pair

 The next project in the shop is a matched pair of canoes, one a 17 footer and the other a 12.5 foot solo canoe.


The first step is to set up the forms and get them level, plumb and aligned correctly.