Ok so its not all fun and games.... this is what happens to strips when the boards you buy are wet and frozen and stored outside at your local lumber yard... I swear they were all straight and pretty when I milled them....
Shop blog and archive of the projects and other things that come through the door.
Friday, January 19, 2018
Wednesday, January 17, 2018
Cheesy?
Thursday, January 11, 2018
Almost there....
Monday, January 08, 2018
Baby its cold outside...
But things are warm and running in the shop this weekend. I am almost, but not quite, finished with the hull of canoe #2. Just a couple more strips to close it up and then on to fairing, sanding, scraping, sanding, sanding, sanding...
And just for fun, I am carving out a Greenland style paddle from a cedar 2x4 to give away at the annual conference of the South Dakota Canoe and Kayak Association.
And just for fun, I am carving out a Greenland style paddle from a cedar 2x4 to give away at the annual conference of the South Dakota Canoe and Kayak Association.
Wednesday, January 03, 2018
New Year Update
I haven't taken any new photos yet this year but wanted to post a quick update. Now that the holidays are over its time to get some serious work completed. First up is the Queen Charlotte overhaul, deck glass, cockpit glass and graphics is on the to do list for that one. Canoe #2 is about closed up, just a few more strips to go, although I do need to mill those strips (I hate it when I underestimate what I need). I do have the fiberglass on hand for the canoe but need to order epoxy.
The annual meeting/conference of the SDCKA is coming up fast and I plan on donating a Greenland paddle or two as door prizes.... I suppose I better get them made right?
And other fun stuff... While on vacation, I met a guy named John who makes super awesome electric violins... check out his site at http://www.jordanmusic.com/ He is defiantly providing inspiration on my next generation of electric ukulele....
The annual meeting/conference of the SDCKA is coming up fast and I plan on donating a Greenland paddle or two as door prizes.... I suppose I better get them made right?
And other fun stuff... While on vacation, I met a guy named John who makes super awesome electric violins... check out his site at http://www.jordanmusic.com/ He is defiantly providing inspiration on my next generation of electric ukulele....
Monday, December 18, 2017
Block Plane
I will tell you that there is no better tool for trimming and fitting cedar strips than the lowly block plane. As we start to fill in the bottom of the canoe, we need to fit the bottom strips to those on the sides. The easiest way is to scribe the angle on the strip, hog off the excess with the band saw and then true up the edge, trim and shape a bead to fit in the cove of the previous strip.
Besides cedar smells so nice when you plane it.
Thursday, December 14, 2017
Getting closer
Canoe Two is getting closer to completion today as the bottom strips are started. The sad part is that I don't know if I have enough strips on hand to finish up the hull. I started with the same amount of boards as canoe one... oh well, it wont take much time to mill up the final strips if I need them.
Wednesday, December 06, 2017
Canoe Two Update
Continuing to install strips, just a few more rows to make it to the waterline. Its kind of cool how each boat takes on a style and life of its own. On this one the strips are about half and half, light/dark. So I started with the light ones first, filled in the wedge with darker strips and now am blending from light to dark around the water line to all dark on the bottom. I'm not much of an artist but I think the effect will be pretty cool once I get the fiberglass all whetted out..
Monday, December 04, 2017
New Acquisition
Here is a project for spring, a 16 foot roylex canoe from The Blue Hole canoe company in Tennessee. I believe this one was constructed in 1986. The hull has some major dings and scrapes but I haven't fond any de-laminations yet. As near as I can tell, this was setup as a white water boat, with the surface damage that it has I would love to hear the adventures this boat could tell.
This project will have to wait for spring. My intention is to make any repairs necessary and set it up for small water fishing. But for now its to the rack to wait out winter....
This project will have to wait for spring. My intention is to make any repairs necessary and set it up for small water fishing. But for now its to the rack to wait out winter....
Monday, November 27, 2017
End gaps
So how do you fill in those end gaps anyway?
If your first strips follow the curve of the bow and stern you get a cool smooth transition on each end. However as you progress along with each additional strip you end up with a funky weird curve that the strips have a hard time holding. So I like to put on two strips following the curve and then the third strip goes parallel
with the waterline to relieve the stress. This leaves an odd triangle that needs to be filled in. Fortunately with enough fiddling around you can fill in this area with hand shaped strips to fit....
If your first strips follow the curve of the bow and stern you get a cool smooth transition on each end. However as you progress along with each additional strip you end up with a funky weird curve that the strips have a hard time holding. So I like to put on two strips following the curve and then the third strip goes parallel
with the waterline to relieve the stress. This leaves an odd triangle that needs to be filled in. Fortunately with enough fiddling around you can fill in this area with hand shaped strips to fit....
Monday, November 20, 2017
Uke Stand
Thursday, November 16, 2017
Interior stems
Thursday, November 09, 2017
Super Awesome Electric Ukulele
Just because some days i have the attention span of a squirrel....
I give you my interpretation of a super awesome electric ukulele... made from a solid piece of walnut about an inch thick. Friction tuners, a handle from a tattoo gun and a passive pickup and a spare piece of aluminum and some fret wire make up the hardware. Finished with a rubbed on tong oil finish, strung up and ready to play!
I give you my interpretation of a super awesome electric ukulele... made from a solid piece of walnut about an inch thick. Friction tuners, a handle from a tattoo gun and a passive pickup and a spare piece of aluminum and some fret wire make up the hardware. Finished with a rubbed on tong oil finish, strung up and ready to play!
Wednesday, November 08, 2017
Tuesday, November 07, 2017
Queen Charlotte Progress
Monday, November 06, 2017
The whole canoe
Tuesday, October 31, 2017
Canoe Prep
I'm setting up for the next 17' canoe. It looks like I found some pretty cool colors in the cedar boards. I used eight 1-1/4x6x10 cedar deck boards to make 104 quarter inch strips. The next step is to put a bead on one side and a cove on the other so everything fits together as they are wrapped around the mold and glued together.
![]() |
| 17' canoe, some assembly required |
![]() |
| Mold is assembled, leveled and plumbed |
Monday, October 30, 2017
Queen Charlotte overhaul
In the shop at the moment is a refinishing project for a 25 year old stitch and glue kayak. This is a Pygmy kit boat that was constructed over 25 years ago. The original design was to only have strips of fiberglass on the inside with a full cover on the outside. The boat received some damage and the plywood did split along one side. The rudder system broke loose from the aft end poor as well.
I have the hardware taken off and repairs are underway. the damage to the aft end is repaired with thickened epoxy poured into the void and will be re-drilled for the rudder. The rest of the boat is ready for another layer of glass, sanded and prepped..
I have the hardware taken off and repairs are underway. the damage to the aft end is repaired with thickened epoxy poured into the void and will be re-drilled for the rudder. The rest of the boat is ready for another layer of glass, sanded and prepped..
New Adventure
I would like to announce the grand launching of the "Twisted Canoe Boat Shop"! www.twistedcanoe.com
We have finally reached the point where enough people wish to purchase canoes that it is time to get serious and start getting things done.
I intend to use this blog as a shop blog to document the daily progress or lack thereof, of each project as it comes in and goes out. This will also give customers updates on their projects while they are under construction.
This is a new venture, half the fun will be trying to figure out how to put it all together and develop a professional web presence and efficient shop.
Stay Tuned!
We have finally reached the point where enough people wish to purchase canoes that it is time to get serious and start getting things done.
I intend to use this blog as a shop blog to document the daily progress or lack thereof, of each project as it comes in and goes out. This will also give customers updates on their projects while they are under construction.
![]() |
| 17' Tandem Canoe |
Stay Tuned!
Monday, February 08, 2016
Catch UP
Ok so things sort of got out of hand there for awhile... the WoodDuck 12 is complete and delivered.
The wood duck is a hybrid plan from CLC with a plywood bottom and a strip built top. the choice of wood we used made life very interesting while trying to put the two together.
I had the typical issues when dealing with a new plan. CLC has a great set of plans but I tend to overthink things and make it a bit harder on my self.
We also used a cheaper material for the plywood, a 1/4 inch luan with an oak face. this caused odd bending and stresses where the designers didn't intend.
Strips were cut from your run of the mill cedar from a big box store and the walnut accent strips I had on hand.
Overall a fun project, the owner is happy and waiting for spring!
![]() |
| Plywood ripped under pressure |
![]() |
| Temporary spacers and bulkhead |
I had the typical issues when dealing with a new plan. CLC has a great set of plans but I tend to overthink things and make it a bit harder on my self.
![]() |
| Stitch and glue hull |
![]() |
| Waiting for the hull to dry |
![]() |
| Forms for the strips |
![]() |
| Adding the strips |
![]() |
| Joining the deck to the hull |
![]() |
| prepping for fiberglass |
![]() |
| Fiberglassing |
![]() |
| Drying the epoxy |
![]() |
| Test paddle |
Strips were cut from your run of the mill cedar from a big box store and the walnut accent strips I had on hand.
Overall a fun project, the owner is happy and waiting for spring!
![]() |
| Delivery! |
Subscribe to:
Posts (Atom)






































